Purpose
The purpose of Phase 0 is to eliminate ambiguity before implementation. EMEP is a complex system spanning model merging, evolutionary search, evaluation, and deployment. Without a shared vocabulary, explicit architecture, and recorded decisions, later phases accumulate technical debt and inconsistent interfaces. Phase 0 produces the reference layer that all other phases depend on.Entry Criteria
- Project charter approved and budget allocated
- Core team assigned (research, architecture, technical writing)
- Access to relevant model merging literature and baseline model repositories
- Documentation toolchain (Mintlify, version control, ADR template) provisioned
Exit Criteria
- All deliverables listed below are published and internally reviewed
- Consistency audit passed: terminology, cross-references, and canonical component names are uniform across all documents
- Architecture review signed off by at least two senior engineers
- ADR log contains no open or disputed decisions
Primary Components
Phase 0 does not produce executable components, but it defines the interfaces and responsibilities that later phases implement:- ModelRegistry: defined as the canonical catalog for model metadata, versions, and lineage
- ModelLoader: specified as the abstraction for loading checkpoints into memory
- ModelCompatibilityAnalyzer: described as the service that determines whether two or more models can be merged
- TensorEngine: outlined as the low-level tensor operation layer
- MergeEngine: conceptualized as the orchestrator for combining model weights
- EvaluationEngine: scoped as the framework for assessing merged model quality
- EvolutionEngine: defined as the search layer that proposes candidate merges
- ExperimentTracker: specified as the observability layer for runs and metrics
- ArtifactStore: described as the persistent storage for models, logs, and artifacts
Deliverables
Dependencies
Phase 0 has no upstream phase dependencies. It is the root of the dependency graph. All subsequent phases depend on its outputs.Key Tasks
Track Phase 0 work in the project task registry: Typical Phase 0 tasks include:- Literature review and paper annotation
- Stakeholder interviews and requirement gathering
- Draft system context and container diagrams
- Write and ratify ADR-001 through ADR-00N
- Build Mintlify documentation skeleton and navigation
- Conduct consistency audit and terminology review
Risks
- Scope creep in documentation: Without a boundary, Phase 0 can expand indefinitely. Mitigate by time-boxing each deliverable.
- Stale decisions: ADRs may become outdated before implementation begins. Mitigate by scheduling a mid-Phase 1 review of all ADRs.
- Inconsistent terminology: Multiple authors may introduce divergent vocabulary. Mitigate by enforcing the glossary as the single source of truth.
Quality Gate
Phase 0 is complete when the following checklist is fully satisfied:- Every canonical component name appears in the glossary with a definition
- Every ADR has a status of “Accepted” or “Superseded”
- All
/architecture/*pages cross-link to related/research/*pages where appropriate - Consistency audit report lists zero unresolved terminology conflicts
- At least one senior engineer has approved the architecture overview
- Diagrams in
/diagrams/*use consistent notation and are exportable